[Case Study] Shizuoka Prefectural General Hospital
[SystemAnswerG2 Introduction] Implement effective investments! Reduce NW equipment by one-third.
At Shizuoka Prefectural General Hospital, there were challenges associated with the expansion and complexity of the ICT infrastructure supporting the hospital, leading to an increased scope of impact from failures and longer times spent on identification and recovery. Each equipment manufacturer provided monitoring tools, but using separate monitoring tools for each manufacturer was inefficient and made it difficult to grasp the overall situation from a bird's-eye view. Additionally, as the hospital prepared for the construction of a new building, it became necessary to review the network and servers, requiring a tool capable of visualizing and monitoring the performance status of the entire multi-vendor network. [Case Study] ■ Challenge: With the expansion and complexity of the ICT infrastructure, the scope of impact from failures increased, and the time spent on identification and recovery gradually lengthened. ■ Start: June 2010 with "BT monitor," switched to "System AnswerG2" in June 2015. ■ Purpose: Infrastructure monitoring for three hospitals under the Shizuoka Prefectural Hospital Organization. ■ Scale/Target: 600 nodes 100 servers (including virtual) 500 routers and switches *For more details, please refer to the PDF document or feel free to contact us.
- 企業:アイビーシー
- 価格:Other